Transatlantic Tunnel
S1, E3: Engineers are at work designing three interconnected floating tunnels between Newfoundland and Scotland that would allow trains to cross the Atlantic in 6.5 hours.

S1, E3: Engineers are at work designing three interconnected floating tunnels between Newfoundland and Scotland that would allow trains to cross the Atlantic in 6.5 hours.